O'Hare Center

Project Type
New Construction, Remodel, and Addition
Location
Menlo Park, CA
Year
2020
Structural Engineer
ZFA Structural Engineers
MEP Engineer
ACIES Engineering
Contractor
Guzman Construction Group, Inc.
Interior Designer
Sandra Livingston-Brady
Photo Credit
Kimberley Ness

This meeting hall at Church of the Nativity in Menlo Park was built in the early 1970s for church group meetings and social events. The Kastrop Group was hired to update the building to be useful for multiple purposes with an additional meeting area, bride dressing room, new restrooms, and kitchen. The gathering space is designed to be flexible, utilizing sound-rated sliding partition doors to reconfigure the space for concurrent uses. New parish offices were also designed for the building to be added as phase two of future construction. The exterior areas were upgraded with custom pavers and trellis bases. This project is the third on this site. We previously restored the historic church and remodeled the rectory.

O'Hare Center, completed project

Before & After

Each pair shows the same view before our work and after the completed project.

  1. Before: Rear Exterior
    Before Rear Exterior
    After: Rear Exterior
    After Rear Exterior
  2. Before: Gathering Hall
    Before Gathering Hall
    After: Gathering Hall
    After Gathering Hall
  3. Before: Kitchen
    Before Kitchen
    After: Kitchen
    After Kitchen
  4. Before: Restroom
    Before Restroom
    After: Restroom
    After Restroom

← Back to project map