Commercial

2114 - 2116 Broadway

Project Type
Mixed Use Building
Location
Redwood City, CA
Year
2014
Structural Engineer
OAK Structural
Contractor
South Bay Construction

This project is in the heart of Redwood City’s downtown theatre district. The existing building, built in 1917, housed the first movie theatre in Redwood City: the Sequoia Theatre. Sadly, the building had been abandoned for the last 10 years.

The Kastrop Group teamed up with the property owners to convert the building into a two-story multi-use retail/office building with an architectural character in-sync with the Redwood City Downtown Precise Plan and respectful of the building’s heritage.

Complicating factors included preserving the grandfathered non-compliant parking and adding accessibility features including an elevator that was built off-site and craned into place.

2114 - 2116 Broadway, completed project

Before & After

Each pair shows the same view before our work and after the completed project.

  1. Before:
    Before
    After:
    After

← Back to project map